Permit: TC-SOL-0625-00801
Permit Details
Apply Date:
06/16/2025
Applicant:
Project Manager
Description:
Rev. 3: 09/16/2025 -- Rev. 2: 09/02/2025 -- Rev. 1: 08/20/2025 -- Installation of a 7.885kw dc system/1 Tesla Battery/MPU 200A
Permit Reviews
Permit Number - TC-SOL-0625-00801
Permit Status: Complete
Permit Description: Rev. 3: 09/16/2025 --
Rev. 2: 09/02/2025 --
Rev. 1: 08/20/2025 --
Installation of a 7.885kw dc system/1 Tesla Battery/MPU 200A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/16/2025 | RESIDENTIAL SOLAR APP v.1 | 06/16/2025 | APPROVED |
| 08/21/2025 | RESIDENTIAL SOLAR REVISION v.1 | 08/21/2025 | APPROVED |
| 09/02/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/02/2025 | APPROVED |
| 09/16/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/16/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00801
Permite Description: Rev. 3: 09/16/2025 --
Rev. 2: 09/02/2025 --
Rev. 1: 08/20/2025 --
Installation of a 7.885kw dc system/1 Tesla Battery/MPU 200A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | BULD - Electrical Clearance | N/A | Not Ready | Failed per pics - 1. Unable to identify wire sizes at the different pieces of equipment, 2. PW3 inverter shall be placed over a solid surface to prevent foliage growth per installation manual |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00801
Permit Description: Rev. 3: 09/16/2025 --
Rev. 2: 09/02/2025 --
Rev. 1: 08/20/2025 --
Installation of a 7.885kw dc system/1 Tesla Battery/MPU 200A
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/01/2025 | BULD - Electrical Clearance | Passed | 10/1/25 TEP CLEARANCE: DGC/BAT |