Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2025 | BULD - Electrical Clearance | Partial Pass | 8/19/25 TEP CLEARANCE: INCR, called TEP @ 3:02. Partial pass pending solar. |
|
| 08/22/2025 | BULD - Electrical Clearance | Re-inspection required | 8/22/25 No response from Field contact: Chris D, phone number: (602) 790-0834. Left voicemail. |
|
| 09/03/2025 | BULD - Electrical Clearance | Not Ready | Failed per pics - 1. Unable to identify wire sizes at the different pieces of equipment, 2. PW3 inverter shall be placed over a solid surface to prevent foliage growth per installation manual | |
| 10/01/2025 | BULD - Electrical Clearance | Passed | 10/1/25 TEP CLEARANCE: DGC/BAT |