Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | 8/22/25 No response from Field contact: Chris D, phone number: (602) 790-0834. Left voicemail. |
|
| 09/03/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | Failed per pics - 1. Unable to identify wire sizes at the different pieces of equipment, 2. PW3 inverter shall be placed over a solid surface to prevent foliage growth per installation manual | |
| 09/17/2025 | COT - RSOL - Electrical Final Solar Project | Passed |