Permit: TC-SOL-0425-00570
Permit Details
Apply Date:
04/29/2025
Applicant:
Marytine Ramos
Description:
REV A: 200A to 125A subpanel Solarapp - Installation of 11.48kW PV System with Battery & sub-panel
Permit Reviews
Permit Number - TC-SOL-0425-00570
Permit Status: Complete
Permit Description: REV A: 200A to 125A subpanel
Solarapp - Installation of 11.48kW PV System with Battery & sub-panel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2025 | RESIDENTIAL SOLAR REVISION v.1 | 06/20/2025 | APPROVED |
| 04/30/2025 | RESIDENTIAL SOLAR APP v.1 | 04/30/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0425-00570
Permite Description: REV A: 200A to 125A subpanel
Solarapp - Installation of 11.48kW PV System with Battery & sub-panel
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 6/12/25 Battery and Inverter location not per plan. Bat is in the garage and the inverter is on the other side of house. Please submit an engineer letter allowing the long run and wire size. |
| 06/12/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | 6/12/25 Battery and Inverter location not per plan. Bat is in the garage and the inverter is on the other side of house. Please submit an engineer letter allowing the long run and wire size. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0425-00570
Permit Description: REV A: 200A to 125A subpanel
Solarapp - Installation of 11.48kW PV System with Battery & sub-panel
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | BULD - Electrical Clearance | Passed | Approved solar and battery - DGC/BAT Clearance to TEP is required for the solar meter | |
| 07/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed |