Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
Permit Number - TC-SOL-0425-00570
Inspection Description - COT - RSOL - Electrical Final Solar Project
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | 6/12/25 Battery and Inverter location not per plan. Bat is in the garage and the inverter is on the other side of house. Please submit an engineer letter allowing the long run and wire size. |
|
| 07/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed |