Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-SOL-0425-00570

Parcel: 133092460

Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/12/2025 BULD - Electrical Clearance Re-inspection required 6/12/25
Battery and Inverter location not per plan. Bat is in the garage and the inverter is on the other side of house. Please submit an engineer letter allowing the long run and wire size.
07/03/2025 BULD - Electrical Clearance Passed Approved solar and battery - DGC/BAT Clearance to TEP is required for the solar meter