Permit: TC-SOL-0125-00101
Permit Details
Apply Date:
01/28/2025
Applicant:
Project Manager
Description:
Installation of a 6.020kw dc system
Permit Reviews
Permit Number - TC-SOL-0125-00101
Permit Status: Complete
Permit Description: Installation of a 6.020kw dc system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2025 | RESIDENTIAL SOLAR REVISION v.1 | 02/05/2025 | APPROVED |
| 01/28/2025 | RESIDENTIAL SOLAR APP v.1 | 01/28/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0125-00101
Permite Description: Installation of a 6.020kw dc system
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 06 FEB 25 1. Main panel neutral and ground needs to be bonded. See Picture 43. 2. Picture 43 main panel bottom right, there is a black conductor looks to be # 8 or 10 that is exposed. |
| 02/06/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | 06 FEB 25 1. Main panel neutral and ground needs to be bonded. See Picture 43. 2. Picture 43 main panel bottom right, there is a black conductor looks to be # 8 or 10 that is exposed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0125-00101
Permit Description: Installation of a 6.020kw dc system
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 02/14/2025 | COT - RSOL - Electrical Final Solar Project | Passed |