Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2025 | BULD - Electrical Clearance | Re-inspection required | 06 FEB 25 1. Main panel neutral and ground needs to be bonded. See Picture 43. 2. Picture 43 main panel bottom right, there is a black conductor looks to be # 8 or 10 that is exposed. |
|
| 02/14/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |