Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | 06 FEB 25 1. Main panel neutral and ground needs to be bonded. See Picture 43. 2. Picture 43 main panel bottom right, there is a black conductor looks to be # 8 or 10 that is exposed. |
|
| 02/14/2025 | COT - RSOL - Electrical Final Solar Project | Passed |