Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
447 S EASTBOURNE AV
Apply Date:
12/13/2023
Applicant:
Frank Corso
Description:
Guest house

Permit Reviews

Permit Number - TC-RES-1223-10064
Permit Status: Complete
Permit Description: Guest house
Start Date Submittal Complete Date Status  
05/24/2024 RESTAMP - RESIDENTIAL v.1 05/24/2024 APPROVED Review Details
04/26/2024 RESIDENTIAL NEW DWELLING v.7 05/24/2024 APPROVED Review Details
02/26/2024 RESIDENTIAL NEW DWELLING v.3 03/27/2024 REQUIRES RESUBMIT Review Details
04/22/2024 RESIDENTIAL NEW DWELLING v.6 04/25/2024 REQUIRES RESUBMIT Review Details
12/13/2023 RESIDENTIAL NEW DWELLING v.1 01/02/2024 REQUIRES RESUBMIT Review Details
01/24/2024 RESIDENTIAL NEW DWELLING v.2 02/12/2024 REQUIRES RESUBMIT Review Details
04/22/2024 RESIDENTIAL NEW DWELLING v.5 04/22/2024 REQUIRES RESUBMIT Review Details
04/17/2024 RESIDENTIAL NEW DWELLING v.4 04/17/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-1223-10064
Permit Status: Complete
Permit Description: Guest house
Date Description Comments
12/28/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
12/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1223-10064
Permite Description: Guest house
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/20/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready Not ready. Missing AB and compaction in slab. Plumbing needs to be wrapped and covered. 6/20/2024
06/20/2024 COT - RSBU - Preslab N/A Not Ready Not ready. Missing AB and compaction in slab. Plumbing needs to be wrapped and covered. 6/20/2024
09/27/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable No gas to building. Not required.
09/27/2024 COT - BULD - SWG Clearance N/A Not Applicable No gas to building. Not required.
09/27/2024 RSBU - Building Final N/A Partial Pass Construction is complete for plumbing, electrical, and mechanical per plans. Entry door is missing hard surface stoop.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1223-10064
Permit Description: Guest house
Total Completed Inspections - 16
Date Description Inspector Results Comments
06/20/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 6/20/2024
06/20/2024 COT - RSEL - Grounding/Bonding Passed
06/20/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 6/20/2024
06/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Not ready. Missing AB and compaction in slab. Plumbing needs to be wrapped and covered. 6/20/2024
6/27/25: corrections made
07/18/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/18/2024 COT - RSBU - Roof Nailing Passed
08/02/2024 COT - RSEL - Electrical Underground Passed
08/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/2/24: plumbing not under test. All penetrations through top plate need to be sealed. Cut nail needed at bedroom closet.
8/6/24: corrections made
08/09/2024 COT - RSBU - Preslab Passed previously passed see comments under excavation, rebar, layout, and zoning corrections made on 6/27
09/27/2024 COT - RSPL - Plumbing Final Passed Construction is complete for plumbing, electrical, and mechanical per plans. Entry door is missing hard surface stoop.
09/27/2024 BULD - Electrical Clearance Passed Electrical power is supplied by main house meter. No electrical clearance required.
09/27/2024 COT - RSEL - Electrical Final Passed Construction is complete for plumbing, electrical, and mechanical per plans. Entry door is missing hard surface stoop.
09/27/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete for plumbing, electrical, and mechanical per plans. Entry door is missing hard surface stoop.
09/27/2024 COT - RSME - Mechanical Final Passed Construction is complete for plumbing, electrical, and mechanical per plans. Entry door is missing hard surface stoop.
09/27/2024 COT - RSPL - Yard Water Line Passed
10/01/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW