Permit: TC-RES-1124-06643
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4509 S 7TH AV UNIT 1
Address NEW:
4509 S 7TH AV UNIT 1
Apply Date:
11/14/2024
Applicant:
Charles Corrales
Description:
Duplex
Permit Reviews
Permit Number - TC-RES-1124-06643
Permit Status: Complete
Permit Description: Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2025 | RESIDENTIAL NEW DWELLING v.3 | 08/26/2025 | REQUIRES RESUBMIT |
| 07/22/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/22/2026 | APPROVED |
| 09/11/2025 | ADMINISTRATIVE v.1 | 09/11/2025 | REQUIRES RESUBMIT |
| 09/10/2025 | RESIDENTIAL NEW DWELLING v.4 | 09/10/2025 | APPROVED |
| 09/11/2025 | RESTAMP - RESIDENTIAL v.1 | 09/11/2025 | APPROVED |
| 09/10/2025 | RESTAMP - RESIDENTIAL v.1 | 09/11/2025 | APPROVED |
| 07/22/2025 | RESIDENTIAL NEW DWELLING v.2 | 08/04/2025 | REQUIRES RESUBMIT |
| 11/19/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/20/2024 | REQUIRES RESUBMIT |
| 01/23/2026 | ADMINISTRATIVE v.2 | 01/23/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1124-06643
Permit Status: Complete
Permit Description: Duplex
| Date | Description | Comments |
|---|---|---|
| 07/22/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 11/19/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/22/2025 | Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, floodplain use permit may be required. Grading development package required to be submitted and approved prior to approval of this permit. | |
| 12/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06643
Permite Description: Duplex
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2026 | COT - RSBU - Preslab | N/A | Re-inspection required (with fee) | 2-19-26: SSTB bolts are required before concrete pour using AnchorMate anchor holders. Install per Simpson specifications. |
| 03/04/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 03/04/2026 Add smoke detector in unit 1 hallway near vicinity of bedrooms. |
| 06/24/2026 | COT - RSEL - Electrical Final | N/A | Canceled | 06/24/2026 Canceled at contractor request. |
| 07/10/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1124-06643
Permit Description: Duplex
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | COT - RSPL - Rough Soil | Passed | Passed 2/13/26, ok to backfill | |
| 02/19/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/26/2026 | COT - RSBU - Roof Nailing | Passed | 2/26/2026 All corrections made to prior inspection. |
|
| 02/26/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/26/2026 All corrections made to prior inspection. |
|
| 03/04/2026 | BULD - Electrical Clearance | Passed | 03/04/2026 Clearance TEP ECO. |
|
| 03/04/2026 | COT - RSEL - Grounding/Bonding | Passed | 03/04/2026 Tied Ufer to MSP. |
|
| 03/04/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 03/04/2026 Verified added smoke detector in hallway same day. |
|
| 03/13/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 3-13-26: drywall screw inspection and fire wall approved. Okay to tape & texture. | |
| 05/27/2026 | COT - RSPL - Sewer | Passed | 5/27/2026 Okay to backfill, backwater valve installed. |
|
| 06/23/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/23/2026 | COT - RSPL - Yard Water Line | Passed | 06/23/2026 Holding under test from meter to riser. Okay to backfill, shading required. |
|
| 07/08/2026 | COT - RSME - Mechanical Final | Passed | 07/08/2026 Corrections made. |
|
| 07/08/2026 | COT - RSPL - Plumbing Final | Passed | 07/08/2026 Corrections made. |
|
| 07/10/2026 | COT - RSEL - Electrical Final | Passed | 07/10/2026 Corrections made. |
|
| 07/10/2026 | RSBU - Building Final | Passed | ||
| 08/05/2026 | ENGR Engineering Final | Passed | Landings comply and DG driveway extends to landings. |