Permit: TC-RES-0924-05632
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2524 E LESTER ST BLDG 0 UNIT 1
Address NEW:
2524 E LESTER ST BLDG 0 UNIT 1
Apply Date:
09/27/2024
Applicant:
Adam Burkhalter
Description:
NEW SFR (IN CONEX)
Permit Reviews
Permit Number - TC-RES-0924-05632
Permit Status: Complete
Permit Description: NEW SFR (IN CONEX)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2025 | RESTAMP - RESIDENTIAL v.1 | 02/27/2025 | APPROVED |
| 08/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | APPROVED |
| 10/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/30/2025 | APPROVED |
| 11/14/2024 | RESIDENTIAL NEW DWELLING v.2 | 12/02/2024 | REQUIRES RESUBMIT |
| 10/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/27/2025 | REQUIRES RESUBMIT |
| 01/08/2025 | RESIDENTIAL NEW DWELLING v.3 | 02/26/2025 | APPROVED |
| 09/27/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/28/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0924-05632
Permit Status: Complete
Permit Description: NEW SFR (IN CONEX)
| Date | Description | Comments |
|---|---|---|
| 02/27/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 01/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/25/2024 | Manual J calculations must be submitted and approved prior to Final Inspection | |
| 10/25/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05632
Permite Description: NEW SFR (IN CONEX)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSPL - Yard Water Line | N/A | Not Ready | work incomplete |
| 05/09/2025 | BULD - Electrical Clearance | N/A | Not Ready | Nothing here but ditches and pipes; not even approved plans. |
| 05/09/2025 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | 1-Observed 2" conduit from SFR location to un-permitted ADU. Bury at own risk. Not per plans. |
| 05/09/2025 | COT - RSPL - Rough Soil | N/A | Partial Pass | 1-SFR plumbing is per plan; sewer not tied in, and 3” line to un-permitted ADU in place with tracer. bury at own risk. |
| 10/13/2025 | RSBU - Building Final | N/A | Re-inspection required | 10-13-25: cooktop/stove is required at time of inspection, missing anti-tip device, missing dishwasher & hammer arrestor, missing hammer arrestors are required for washer & dryer, seal water closets, install shackle on water heater breaker, paint all exterior pvc/abs, provide UL listing for exterior receptacle covers showing that covers are rated "heavy duty while in use," otherwise replace using bubble covers, missing clean out at kitchen sink and at bathroom. Plans call for a clean out at water closet and at tub. Submit an RFI for tub clean out and install clean out for water closet. Missing gray water -see plans and cut clean out to grade, install address identification where visible from the roadway and for unit's themselves. Cut condensation line 6” above grade. See notes for solar water system on page GN1.0- City of Tucson Ordinance 10549 states a 1/2” control conduit and 2-3/4” copper piping for water with rooftop termination; straight 3” capped sleeve is required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05632
Permit Description: NEW SFR (IN CONEX)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Pads for container units. | |
| 04/02/2025 | COT - RSBU - Preslab | Passed | Pads for container units. | |
| 07/28/2025 | COT - RSPL - Yard Water Line | Passed | Duplicate inspection. 7/28/2025 | |
| 07/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/15/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. UNIT #1. 9/15/2025 | |
| 09/15/2025 | COT - RSEL - Electrical Underground | Passed | Per unit 1, inspection item is not applicable. Notes will be used per future unit once permits have been released. 9/15/2025 | |
| 09/15/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/01/2025 | COT - RSPL - Sewer | Passed | ||
| 10/01/2025 | COT - RSPL - Rough Soil | Passed | ||
| 10/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | 10-13-25: approved. | |
| 10/21/2025 | RSBU - Building Final | Passed | ||
| 10/21/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/21/2025 | COT - RSEL - Electrical Final | Passed | ||
| 10/21/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/21/2025 | COT - RSME - Mechanical Final | Passed | ||
| 10/21/2025 | COT - RSPL - Plumbing Final | Passed |