Permit: TC-RES-0924-05251
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
4411 E TIMROD ST
Address NEW:
4411 E TIMROD ST
Apply Date:
09/10/2024
Applicant:
Brisa Soto
Description:
Replace an Arizona Room and Den with a Game Room and Bedroom Suite
Permit Reviews
Permit Number - TC-RES-0924-05251
Permit Status: Inspections complete
Permit Description: Replace an Arizona Room and Den with a Game Room and Bedroom Suite
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/14/2024 | RESIDENTIAL NEW DWELLING v.2 | 11/20/2024 | APPROVED |
| 09/11/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/11/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0924-05251
Permit Status: Inspections complete
Permit Description: Replace an Arizona Room and Den with a Game Room and Bedroom Suite
| Date | Description | Comments |
|---|---|---|
| 11/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0924-05251
Permite Description: Replace an Arizona Room and Den with a Game Room and Bedroom Suite
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Partial pass. Pending T1-11. 12/26/2024 |
| 03/14/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 02/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 1-Extend electrical boxes through T-111. 2-Seal fire-blocking penetrations. 3-Floor is not poured in Master Bedroom per approved plans. 4-Support header at East end of new opening. 5-Complete plumbing rough-in. 6-Complete Mechanical rough-in. 7-Complete UG plumbing, and obtain approval. |
| 05/23/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 5/23/25 1. Loose outlet in Master bedroom 2.caulk need on toilet 3. Kitchen small appliance is on 1 circuit 4. Island has no power. 5. Water hammer arrestors needed at ice maker and dishwasher, washer. 6. GFCI needed for washer. 7. Dishwasher/garbage disposal needs to be GFCI protected. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0924-05251
Permit Description: Replace an Arizona Room and Den with a Game Room and Bedroom Suite
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2024 | COT - RSBU - Preslab | Passed | Okay for concrete placement in slab and footings. 11/23/2024 | |
| 11/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and footings size per plan. Okay for concrete placement. 11/22/2024 | |
| 12/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 02/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/18/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/24/2025 | COT - RSPL - Rough Soil | Passed | ||
| 05/23/2025 | COT - RSME - Mechanical Final | Passed | ||
| 05/28/2025 | COT - RSEL - Electrical Final | Passed | 5/28/25 Pass |
|
| 05/28/2025 | BULD - Electrical Clearance | Passed | 5/28/25 Pass |
|
| 05/28/2025 | COT - RSPL - Plumbing Final | Passed | 5/28/25 Pass |
|
| 05/28/2025 | RSBU - Building Final | Passed |