Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | BULD - Electrical Clearance | Re-inspection required | 1-Grounding electrode conductor must be continuous to first electrode. 2-Provide second ground rod, or testing to verify maximum resistance per Code. 3-Connections to ground rods must be accessible. |
|
| 02/28/2025 | BULD - Electrical Clearance | Passed | INCR | |
| 05/23/2025 | BULD - Electrical Clearance | Re-inspection required | 5/23/25 1. Loose outlet in Master bedroom 2.caulk need on toilet 3. Kitchen small appliance is on 1 circuit 4. Island has no power. 5. Water hammer arrestors needed at ice maker and dishwasher, washer. 6. GFCI needed for washer. 7. Dishwasher/garbage disposal needs to be GFCI protected. |
|
| 05/28/2025 | BULD - Electrical Clearance | Passed | 5/28/25 Pass |