Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
2602 S CAMINO SECO
Apply Date:
08/12/2025
Applicant:
Jose Garcia
Description:
fire restoration

Permit Reviews

Permit Number - TC-RES-0825-03974
Permit Status: Inspections
Permit Description: fire restoration
Start Date Submittal Complete Date Status  
08/13/2025 RESIDENTIAL ADD/ALT v.1 09/11/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0825-03974
Permit Status: Inspections
Permit Description: fire restoration
Date Description Comments
08/13/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0825-03974
Permite Description: fire restoration
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready 1-Studor vent needs to be accessible.
2-Nail plates missing at plumbing throughout.
3-Studs are over-notched at laundry wall.
4-Holes in bedroom are drilled less than 2" from bottom.
5- Install ductwork per manufacurer's instructions.
6-Complete framing.
Nor ready. Inspection stopped. If inspection does not pass next time, a re-inspection fee will be assessed.
11/10/2025 RSEL - Electrical Progress N/A Not Ready 1-Studor vent needs to be accessible.
2-Nail plates missing at plumbing throughout.
3-Studs are over-notched at laundry wall.
4-Holes in bedroom are drilled less than 2" from bottom.
5- Install ductwork per manufacurer's instructions.
6-Complete framing.
Nor ready. Inspection stopped. If inspection does not pass next time, a re-inspection fee will be assessed.
11/10/2025 RSME - Mechanical Progress N/A Not Ready 1-Studor vent needs to be accessible.
2-Nail plates missing at plumbing throughout.
3-Studs are over-notched at laundry wall.
4-Holes in bedroom are drilled less than 2" from bottom.
5- Install ductwork per manufacurer's instructions.
6-Complete framing.
Nor ready. Inspection stopped. If inspection does not pass next time, a re-inspection fee will be assessed.
11/10/2025 RSPL - Plumbing Progress N/A Not Ready 1-Studor vent needs to be accessible.
2-Nail plates missing at plumbing throughout.
3-Studs are over-notched at laundry wall.
4-Holes in bedroom are drilled less than 2" from bottom.
5- Install ductwork per manufacurer's instructions.
6-Complete framing.
Nor ready. Inspection stopped. If inspection does not pass next time, a re-inspection fee will be assessed.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2602 S.CAMINO SECO - FIRE DAMAGE REPAIRS - PERMIT 1-16-2025_V1.PDF DOCUMENTS VIEW