Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
212 S PANORAMA CI
Apply Date:
08/07/2025
Applicant:
PABLO ROJO
Description:
Enlarge rooms under existing overhang

Permit Reviews

Permit Number - TC-RES-0825-03912
Permit Status: Complete
Permit Description: Enlarge rooms under existing overhang
Start Date Submittal Complete Date Status  
09/11/2025 RESIDENTIAL ADD/ALT v.2 10/13/2025 REQUIRES RESUBMIT Review Details
08/08/2025 RESIDENTIAL ADD/ALT v.1 09/08/2025 REQUIRES RESUBMIT Review Details
10/23/2025 RESTAMP - RESIDENTIAL v.1 10/23/2025 APPROVED Review Details
10/17/2025 RESIDENTIAL ADD/ALT v.3 10/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0825-03912
Permit Status: Complete
Permit Description: Enlarge rooms under existing overhang
Date Description Comments
08/08/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0825-03912
Permit Description: Enlarge rooms under existing overhang
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 10-29-25: reinforcement & excavation verified per details. Okay to pour footing and slab
11/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Approved new beam in place along with post and all hardware. 11/14/2024
11/21/2025 RSBU - Building Final Passed 11-21-25: approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-NORIS REVISION 2_V3.PDF DOCUMENTS VIEW
REVISION NORIS_V2.PDF DOCUMENTS VIEW