Permit: TC-RES-0824-04955
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1252 S SAN ANTONIO DR
Address NEW:
1252 S SAN ANTONIO DR
Apply Date:
08/26/2024
Applicant:
Maria Robles
Description:
Flex; Laundry and Two Bedroom Addition
Permit Reviews
Permit Number - TC-RES-0824-04955
Permit Status: Inspections
Permit Description: Flex; Laundry and Two Bedroom Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/26/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/27/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0824-04955
Permite Description: Flex; Laundry and Two Bedroom Addition
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 3-26-25, add anchor bolts to marked locations together with shot pins throughout. Add nails to exterior sheathing along edges at marked areas & nails where over penetrated (no more than 1/16 of an inch). Add nails to loose roof panels at marked locations and provide a ladder on reinspect to properly inspect sheathing above. |
| 03/26/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 3-26-25, add anchor bolts to marked locations together with shot pins throughout. Add nails to exterior sheathing along edges at marked areas & nails where over penetrated (no more than 1/16 of an inch). Add nails to loose roof panels at marked locations and provide a ladder on reinspect to properly inspect sheathing above. |
| 08/29/2025 | RSBU - Building Final | N/A | Partial Pass | 8-29-25: drywall nailing approved-okay for tape & texture. Add or relocate receptacle to where it is not spaced more than 12' apart (middle bedroom). Install all receptacle covers, plumbing fixtures, exterior lights, etc..and schedule finals when ready. |
| 12/04/2024 | COT - RSPL - Plumbing Final | N/A | Partial Pass | Sewer line from new addition area to main sewer. Ok to cover progress area. |
| 08/29/2025 | COT - RSME - Mechanical Final | N/A | Not Ready | 8-29-25: not ready. |
| 08/29/2025 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | 8-29-25: not ready. |
| 08/29/2025 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | 8-29-25: not ready. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0824-04955
Permit Description: Flex; Laundry and Two Bedroom Addition
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2024 | COT - RSBU - Preslab | Passed | 12/19/24: reinforcement per plan ok to proceed with concrete pour | |
| 12/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/19/24: reinforcement per plan ok to proceed with concrete pour | |
| 03/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3/28/25 corrections made ok to proceed | |
| 03/28/2025 | COT - RSBU - Roof Nailing | Passed | 3/28/25 corrections made ok to proceed | |
| 04/02/2025 | BULD - Electrical Clearance | Passed | 4/2/25:TEP INCR CLEARANCE FOR 1252 S SAN ANTONIO DR | |
| 06/30/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/30/2025 | COT - RSPL - Rough Soil | Passed | ||
| 07/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7/3/25 pass |
|
| 07/21/2026 | RSBU - Building Final | Passed | 07/21/2026 Corrections made to prior inspection. |
|
| 07/21/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/21/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/21/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/21/2026 | COT - RSEL - Grounding/Bonding | Passed |