Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
06/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 6/30/25: Seal all penetrations through top plates and vapor barrier, nail plates required at bedroom #2 and laundry room, properly support pex line in ceiling at bedroom #1, properly support gas line at ceiling in bedroom #1, smoke detector required outside bedrooms, fire blocking required at soffit areas at laundry room, seal penetration from existing home into addition in soffit areas. Damaged sheathing at NM cable at sub panel must be taped. Lath passed.
07/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/3/25
pass