Permit: TC-RES-0824-04574
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
10421 E CALLE TRECE
Address NEW:
10421 E CALLE TRECE
Apply Date:
08/06/2024
Applicant:
Greg Mason
Description:
SFR replacement for demo unit TC-DMO-0224-00020
Permit Reviews
Permit Number - TC-RES-0824-04574
Permit Status: Issued
Permit Description: SFR replacement for demo unit TC-DMO-0224-00020
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/06/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/11/2024 | REQUIRES RESUBMIT |
| 02/03/2025 | RESIDENTIAL NEW DWELLING REVISION v.2 | 03/10/2025 | APPROVED |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/21/2025 | APPROVED |
| 10/07/2024 | RESIDENTIAL NEW DWELLING v.2 | 10/29/2024 | APPROVED |
| 01/30/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 01/31/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0824-04574
Permit Status: Issued
Permit Description: SFR replacement for demo unit TC-DMO-0224-00020
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0824-04574
Permit Status: Issued
Permit Description: SFR replacement for demo unit TC-DMO-0224-00020
| Date | Description | Comments |
|---|---|---|
| 10/07/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0824-04574
Permite Description: SFR replacement for demo unit TC-DMO-0224-00020
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | Not Applicable, no interior shear walls. |
| 04/01/2025 | COT - RSEL - Outdoor Lighting | N/A | Canceled | Canceled |
| 03/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 3/13/25: lath must complete for residential intermediate inspection, seal all penetrations through top plate and vapor barrier, DWV must be under test, straps required midway at DWV in wall. STOPPED INSPECTION PLEASE CALL BACK AFTER LATH IS COMPLETE. MORE ITEMS MAY BE ADDED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0824-04574
Permit Description: SFR replacement for demo unit TC-DMO-0224-00020
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | COT - RSPL - Rough Soil | Passed | 1-14-25, underground plumbing verified as per approved plans. Okay to backfill-provide shading.When ready schedule HCS connection and water line. | |
| 01/31/2025 | COT - RSBU - Preslab | Passed | 1-31-25, excavation/rebar layout, preslab for front & back porch areas verified as per approved plans. Okay to pour concrete. | |
| 01/31/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-31-25, excavation/rebar layout, preslab for front & back porch areas verified as per approved plans. Okay to pour concrete. | |
| 02/19/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to dry-in roof, exterior walls, and begin rough-in of mechanical, electrical, and plumbing. | |
| 02/19/2025 | COT - RSBU - Roof Nailing | Passed | Okay to dry-in roof, exterior walls, and begin rough-in of mechanical, electrical, and plumbing. | |
| 03/13/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 03/13/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/14/2025 | COT - RSPL - Yard Water Line | Passed | Passed 3/14/25 ok to backfill | |
| 03/14/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 3/14/25 | |
| 04/01/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed and covered | |
| 04/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/3/25 Corrections made | |
| 05/12/2025 | COT - BULD - SWG Clearance | Passed | Passed 5/6/25 CLEARANCE SWG |