Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
3/13/25: lath must complete for residential intermediate inspection, seal all penetrations through top plate and vapor barrier, DWV must be under test, straps required midway at DWV in wall. STOPPED INSPECTION PLEASE CALL BACK AFTER LATH IS COMPLETE. MORE ITEMS MAY BE ADDED |
| 03/28/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
1-Complete fireplace. 2-Complete ductwork on back porch. 3-Romex wiring can not be between metal duct and framing supporting it. 4- Provide 1" minimum clearance between b-vent and combustible construction. 5-Smoke detectors are too close to walls. |
| 04/03/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
4/3/25 Corrections made |