Permit: TC-RES-0823-07262
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2210 E WAVERLY ST UNIT 2
Address NEW:
2210 E WAVERLY ST UNIT 2
Apply Date:
08/11/2023
Applicant:
Nathan Kappler
Description:
Accessory Dwelling Unit
Permit Reviews
Permit Number - TC-RES-0823-07262
Permit Status: Complete
Permit Description: Accessory Dwelling Unit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/24/2023 | REQUIRES RESUBMIT |
| 09/06/2023 | RESIDENTIAL NEW DWELLING v.3 | 10/06/2023 | APPROVED |
| 09/05/2023 | RESIDENTIAL NEW DWELLING v.2 | 09/05/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0823-07262
Permit Status: Complete
Permit Description: Accessory Dwelling Unit
| Date | Description | Comments |
|---|---|---|
| 08/23/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07262
Permite Description: Accessory Dwelling Unit
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Partial pass. Revise plans on window being changed out to a door in bedroom and framing flipped in bathroom. RFI on adding a window in bedroom for lighting. 1/5/2024 |
| 01/05/2024 | COT - RSBU - Roof Nailing | N/A | Partial Pass | Partial pass. Revise plans on window being changed out to a door in bedroom and framing flipped in bathroom. RFI on adding a window in bedroom for lighting. 1/5/2024 |
| 01/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Electric and mechanical passed. Plumbing is,partial as gas pressure test is required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07262
Permit Description: Accessory Dwelling Unit
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2023 | COT - RSPL - Rough Soil | Passed | Plumbing under slab approved. Okay to backfill, shading required. 12/12/2023 | |
| 12/19/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar per plan in footings and slab. Call for hold downs but those will be wet set. 12/19/2023 | |
| 12/19/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/19/2023 | COT - RSBU - Preslab | Passed | Rebar per plan in footings and slab. Call for hold downs but those will be wet set. 12/19/2023 | |
| 01/29/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to cover exterior walls. | |
| 01/29/2024 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
| 02/06/2024 | COT - RSPL - Sewer | Passed | ||
| 02/20/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/13/2024 | BULD - Electrical Clearance | Passed | ||
| 04/26/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/26/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/26/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/02/2024 | COT - RSEL - Electrical Final | Passed | ||
| 05/02/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 05/02/2024 | COT - RSME - Mechanical Final | Passed | ||
| 05/06/2024 | RSBU - Building Final | Passed |