Permit: TC-RES-0823-07205
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
9242 E HELEN ST
Address NEW:
9242 E HELEN ST
Apply Date:
08/09/2023
Applicant:
Daniel Hutcherson
Description:
New bonus room addition REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Permit Reviews
Permit Number - TC-RES-0823-07205
Permit Status: Issued
Permit Description: New bonus room addition
REV1: Revised framing plan and associated details. Updated roof plan and elevations.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/06/2023 | REQUIRES RESUBMIT |
| 03/04/2025 | RESIDENTIAL NEW DWELLING v.1 | 03/04/2025 | REQUIRES RESUBMIT |
| 03/20/2025 | RESIDENTIAL NEW DWELLING v.3 | 04/22/2025 | APPROVED |
| 03/12/2025 | RESIDENTIAL NEW DWELLING v.2 | 03/12/2025 | REQUIRES RESUBMIT |
| 05/21/2024 | RESIDENTIAL NEW DWELLING v.2 | 06/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0823-07205
Permit Status: Issued
Permit Description: New bonus room addition
REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/11/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. |
| 06/11/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
| 06/28/2024 | Provide HVAC demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. |
| 06/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0823-07205
Permite Description: New bonus room addition
REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | Obtain Intermediate inspection approval and outdoor lighting partial approval and Lath approval, before installing insulation or drywall. After installing drywall, but before taping or texturing schedule and obtain approval for this inspection. |
| 05/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0823-07205
Permit Description: New bonus room addition
REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing for new bathroom addition is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trench. | |
| 11/08/2024 | COT - RSPL - Sewer | Passed | Underground plumbing for new bathroom addition is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trench. | |
| 11/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/22/2024 | COT - RSBU - Preslab | Passed | ||
| 04/24/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/12/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/05/2025 | RSEL - Electrical Progress | Passed | pass | |
| 06/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |