Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
9242 E HELEN ST
Address NEW:
9242 E HELEN ST
Apply Date:
08/09/2023
Applicant:
Daniel Hutcherson
Description:
New bonus room addition REV1: Revised framing plan and associated details. Updated roof plan and elevations.

Permit Reviews

Permit Number - TC-RES-0823-07205
Permit Status: Issued
Permit Description: New bonus room addition REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Start Date Submittal Complete Date Status  
08/17/2023 RESIDENTIAL NEW DWELLING v.1 09/06/2023 REQUIRES RESUBMIT Review Details
03/04/2025 RESIDENTIAL NEW DWELLING v.1 03/04/2025 REQUIRES RESUBMIT Review Details
03/20/2025 RESIDENTIAL NEW DWELLING v.3 04/22/2025 APPROVED Review Details
03/12/2025 RESIDENTIAL NEW DWELLING v.2 03/12/2025 REQUIRES RESUBMIT Review Details
05/21/2024 RESIDENTIAL NEW DWELLING v.2 06/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0823-07205
Permit Status: Issued
Permit Description: New bonus room addition REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Total Outstanding Activity Conditions - 4
Date Name
06/11/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
06/11/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/28/2024 Provide HVAC demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D.
06/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0823-07205
Permite Description: New bonus room addition REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/12/2025 COT - RSBU - Interior Shear Bracing N/A Not Ready Obtain Intermediate inspection approval and outdoor lighting partial approval and Lath approval, before installing insulation or drywall. After installing drywall, but before taping or texturing schedule and obtain approval for this inspection.
05/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0823-07205
Permit Description: New bonus room addition REV1: Revised framing plan and associated details. Updated roof plan and elevations.
Total Completed Inspections - 8
Date Description Inspector Results Comments
11/08/2024 COT - RSPL - Rough Soil Passed Underground plumbing for new bathroom addition is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trench.
11/08/2024 COT - RSPL - Sewer Passed Underground plumbing for new bathroom addition is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trench.
11/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
11/22/2024 COT - RSBU - Preslab Passed
04/24/2025 COT - RSBU - Roof Nailing Passed
05/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/05/2025 RSEL - Electrical Progress Passed pass
06/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-25.3.6 JANSEN REVISION_V2_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONSTRUCTION_SET2_1_V2.PDF DOCUMENTS VIEW