Permit: TC-RES-0823-07112
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3693 S CAMINO SECO
Address NEW:
3693 S CAMINO SECO
Apply Date:
08/07/2023
Applicant:
Francisco Lizarraga
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0823-07112
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/15/2023 | RESIDENTIAL NEW DWELLING v.3 | 12/28/2023 | REQUIRES RESUBMIT |
| 03/27/2024 | RESTAMP - RESIDENTIAL v.1 | 04/01/2024 | APPROVED |
| 01/22/2024 | RESIDENTIAL NEW DWELLING v.4 | 02/05/2024 | REQUIRES RESUBMIT |
| 08/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/28/2023 | REQUIRES RESUBMIT |
| 02/26/2024 | RESIDENTIAL NEW DWELLING v.5 | 03/27/2024 | APPROVED |
| 06/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2025 | APPROVED |
| 09/26/2023 | RESIDENTIAL NEW DWELLING v.2 | 09/26/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0823-07112
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 03/27/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07112
Permite Description: SFR
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 10/14/24: Install second ground rod and connect copper grounding wire |
| 10/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/14/24: register needs to be blocked in back hallway. DWV not under test. Tub not under test. All top plate penetrations need to be sealed. Anchor bolts needed at break in plates and within 12 inches of end of plate. Duct work needs to be supported and strapped throughout. Stopped inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0823-07112
Permit Description: SFR
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2024 | COT - RSPL - Rough Soil | Passed | 9/4/24: Entire underground plumbing is under a water test from backwater valve to last fixture in system. | |
| 09/05/2024 | COT - RSPL - Backwater Valve | Passed | 9/4/24: Entire underground plumbing is under a water test from backwater valve to last fixture in system. | |
| 09/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/06/2024 | COT - RSBU - Preslab | Passed | ||
| 09/27/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly nailed to studs per plan requirements. Okay to proceed with tape, texture, and paint of all walls and ceilings. | |
| 04/02/2025 | BULD - Electrical Clearance | Passed | Approved new 200A service panel - ECO Clearance is required | |
| 06/20/2025 | COT - RSEL - Outdoor Lighting | Passed | Per Ralph 9/24/24 all piping underground passed | |
| 06/20/2025 | COT - RSPL - Yard Water Line | Passed | Per Ralph 9/24/24 all piping underground passed | |
| 06/20/2025 | COT - RSPL - Sewer | Passed | Per Ralph 9/24/24 all piping underground passed | |
| 06/25/2025 | RSBU - Building Final | Passed | 6/25/25 corrections made | |
| 06/25/2025 | COT - RSME - Mechanical Final | Passed | 6/25/25 corrections made | |
| 06/25/2025 | COT - RSEL - Electrical Final | Passed | 6/25/25 corrections made | |
| 06/25/2025 | COT - RSPL - Plumbing Final | Passed | 6/25/25 corrections made | |
| 06/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | duplicate inspection |