Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | duplicate inspection | |
| 10/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/14/24: register needs to be blocked in back hallway. DWV not under test. Tub not under test. All top plate penetrations need to be sealed. Anchor bolts needed at break in plates and within 12 inches of end of plate. Duct work needs to be supported and strapped throughout. Stopped inspection. | |
| 10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/15/24: missing anchor bolts. DWV needs to be under test. All Penetrations need to be sealed through top plate. | |
| 10/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 10/16/24: missing anchor bolts have been installed, DWV is under a water test. All Penetrations have been sealed through top plate. Okay to insulate and sheet rock all non-wet walls because of water supply issues and sewer issues at this time. |
|
| 10/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/16/24: Full Pass: DWV and water supply lies are under a pressure test throughout the house. Okay to proceed with installation of insulation and drywall. |