Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
401 N BROWN AV
Address NEW:
401 N BROWN AV
Apply Date:
07/17/2024
Applicant:
Bobby Poplin
Description:
Fire Damage Repair CE-VIOO0524-01882

Permit Reviews

Permit Number - TC-RES-0724-04183
Permit Status: Complete
Permit Description: Fire Damage Repair CE-VIOO0524-01882
Start Date Submittal Complete Date Status  
07/17/2024 RESIDENTIAL NEW DWELLING v.1 07/17/2024 REQUIRES RESUBMIT Review Details
07/18/2024 RESIDENTIAL NEW DWELLING v.2 08/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0724-04183
Permit Status: Complete
Permit Description: Fire Damage Repair CE-VIOO0524-01882
Date Description Comments
08/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0724-04183
Permit Description: Fire Damage Repair CE-VIOO0524-01882
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/20/2024 BULD - Electrical Clearance Passed Okay to energize panel. RECN CLEARANCE ISSUED.
01/08/2025 COT - RSBU - Roof Nailing Passed New rafters and plywood is installed over garage. Sheathing is properly nailed and H2.5 clips are installed. Okay to proceed with roofing material on garage.
01/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed New electrical sub-panel is installed and properly wired. Okay to proceed with further work.
05/16/2025 RSBU - Building Final Passed Passed final 5/16/26
05/16/2025 COT - RSEL - Electrical Final Passed Passed final 5/16/26
05/15/2025 COT - RSME - Mechanical Final Passed Passed 5/15/25
05/16/2025 COT - RSPL - Gas Pressure Test Passed 5/16/25 corrections made CLEARANCE SWG
05/16/2025 COT - RSPL - Plumbing Final Passed Passed final 5/16/26
05/16/2025 COT - BULD - SWG Clearance Passed 5/16/25 corrections made CLEARANCE SWG

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
24165 MJ_V2.PDF DOCUMENTS VIEW
CONS-1_DRAWINGS_LEWIS RESIDENCE_V2.PDF DOCUMENTS VIEW