Inspection Status: Not Ready
Inspection History: COT - RSPL - Gas Pressure Test
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2025 |
COT - RSPL - Gas Pressure Test |
|
Not Ready |
1-25-22, not ready-not under pressure. Must be set at 15psi for a minimum of 10 minutes. |
| 01/24/2025 |
COT - RSPL - Gas Pressure Test |
|
Re-inspection required |
1-24-25, pex lines were ran directly to the gas water heater-see ch. 28 of the international residential code for additional information/code requirements. Missing pressure relieve valve, catch pan, and no condensation line extending to the exterior |
| 05/15/2025 |
COT - RSPL - Gas Pressure Test |
|
Passed |
5/16/25 corrections made CLEARANCE SWG |