Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Re-inspection required
Inspection History: COT - BULD - SWG Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 01/17/2025 |
COT - BULD - SWG Clearance |
|
Re-inspection required |
New gas line not installed at hot water heater, no sediment trap on gas line, gas line not properly supported; needs to be installed inside of rear or side wall to protect from damage. Gas meter is in the alley at the southwest corner of property; appears that gas line maybe running underneath storage building in southwest corner of backyard. Storage building is not shown on site plan. |
| 01/22/2025 |
COT - BULD - SWG Clearance |
|
Not Ready |
1-25-22, not ready-not under pressure. Must be set at 15psi for a minimum of 10 minutes. |
| 01/24/2025 |
COT - BULD - SWG Clearance |
|
Re-inspection required |
1-24-25, pex lines were ran directly to the gas water heater-see ch. 28 of the international residential code for additional information/code requirements. Missing pressure relieve valve, catch pan, and no condensation line extending to the exterior |
| 05/16/2025 |
COT - BULD - SWG Clearance |
|
Passed |
5/16/25 corrections made CLEARANCE SWG |