Permit: TC-RES-0723-06902
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5649 S LIBERTY AV
Address NEW:
5649 S LIBERTY AV
Apply Date:
07/30/2023
Applicant:
Alma Ramos
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0723-06902
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/17/2024 | RESIDENTIAL NEW DWELLING v.3 | 09/25/2024 | REQUIRES RESUBMIT |
| 10/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/31/2024 | APPROVED |
| 07/23/2024 | RESIDENTIAL NEW DWELLING v.1 | 07/23/2024 | REQUIRES RESUBMIT |
| 08/04/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/21/2023 | APPROVED |
| 09/26/2024 | RESIDENTIAL NEW DWELLING v.4 | 10/11/2024 | APPROVED |
| 07/24/2024 | RESIDENTIAL NEW DWELLING v.2 | 09/03/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0723-06902
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 08/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06902
Permite Description: SFR
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Partial pass. UFER connected to bottom of rebar. Pending placement in electrical panel. 10/24/2024 |
| 10/22/2024 | COT - RSPL - Rough Soil | N/A | Partial Pass | Partial pass. Missing grey water loop. 10/18/2024 10/21/24: per previous notes missing grey water loop. 10/22/24: corrections made. Set backs not per plan |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06902
Permit Description: SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | COT - RSBU - Preslab | Passed | Rebar and footings per plan. Okay for concrete placement in slab. 10/24/2024 | |
| 10/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and footings per plan. Okay for concrete placement in slab. 10/24/2024 | |
| 10/24/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/30/24 Corrections were made. | |
| 10/30/2024 | COT - RSBU - Roof Nailing | Passed | 10/30/24 Corrections were made. | |
| 11/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-4-24, intermediates approved. Okay to continue construction per approved plans. | |
| 11/14/2024 | BULD - Electrical Clearance | Passed | 11/14/24 Electrical clearance for TEP. PASS | |
| 11/14/2024 | COT - RSPL - Sewer | Passed | 11/14/24 pass, OK to proceed with backfill. | |
| 01/09/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/09/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 01/09/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/09/2025 | COT - RSPL - Rough Soil | Passed | ||
| 01/09/2025 | RSBU - Building Final | Passed | 01/09/25 Passed |
|
| 01/09/2025 | COT - RSEL - Electrical Final | Passed | 01/09/25 Passed |
|
| 01/09/2025 | COT - RSME - Mechanical Final | Passed | 01/09/25 Passed |
|
| 01/09/2025 | COT - RSPL - Plumbing Final | Passed |