Permit: TC-RES-0723-06894
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1207 E 36TH ST
Address NEW:
1207 E 36TH ST
Apply Date:
07/28/2023
Applicant:
Inai Maldonado
Description:
Duplex.
Permit Reviews
Permit Number - TC-RES-0723-06894
Permit Status: Complete
Permit Description: Duplex.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/25/2023 | APPROVED |
| 08/04/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/17/2023 | REQUIRES RESUBMIT |
| 09/22/2023 | RESIDENTIAL NEW DWELLING v.1 | 10/02/2023 | APPROVED |
| 06/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/07/2024 | APPROVED |
| 02/13/2024 | RESIDENTIAL NEW DWELLING v.1 | 02/13/2024 | APPROVED |
| 08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2024 | APPROVED |
| 07/29/2024 | RESIDENTIAL NEW DWELLING REVISION v.1 | 07/29/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0723-06894
Permit Status: Complete
Permit Description: Duplex.
| Date | Description | Comments |
|---|---|---|
| 08/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/05/2023 | This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
| 08/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06894
Permite Description: Duplex.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06894
Permit Description: Duplex.
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2024 | COT - RSBU - Preslab and floodplain | Passed | ||
| 02/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/07/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system | |
| 04/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/05/2024 | BULD - Electrical Clearance | Passed | units 1&2 | |
| 04/05/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 04/05/2024 | COT - RSPL - Sewer | Passed | ||
| 08/02/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 08/02/2024 | COT - RSPL - Rough Soil | Passed | ||
| 08/02/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 08/02/2024 | COT - RSME - Mechanical Final | Passed | ||
| 08/02/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/09/2024 | COT - RSEL - Electrical Final | Passed | 8/2/24: properly terminate condensate drain from A/C unit, exterior receptacles must be WR, T&P discharge must terminate 6" above grade, UV coat all exterior piping, GFCI required at Disposal, Support disconnect at water heater, Arc-faults missing throughout, add ground rod at electrical panels. 8/9/24: corrections made ok for CofO |
|
| 08/09/2024 | RSBU - Building Final | Passed | 8/2/24: properly terminate condensate drain from A/C unit, exterior receptacles must be WR, T&P discharge must terminate 6" above grade, UV coat all exterior piping, GFCI required at Disposal, Support disconnect at water heater, Arc-faults missing throughout, add ground rod at electrical panels. 8/9/24: corrections made ok for CofO |