Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| RSBU - Building Final | Re-inspection required | 8/2/24: properly terminate condensate drain from A/C unit, exterior receptacles must be WR, T&P discharge must terminate 6" above grade, UV coat all exterior piping, GFCI required at Disposal, Support disconnect at water heater, Arc-faults missing throughout, add ground rod at electrical panels. | ||
| 08/09/2024 | RSBU - Building Final | Passed | 8/2/24: properly terminate condensate drain from A/C unit, exterior receptacles must be WR, T&P discharge must terminate 6" above grade, UV coat all exterior piping, GFCI required at Disposal, Support disconnect at water heater, Arc-faults missing throughout, add ground rod at electrical panels. 8/9/24: corrections made ok for CofO |