Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
07/17/2023
Applicant:
Elaine Charteris
Description:
ADU and Living Quarters Unit with Porch Addition

Permit Reviews

Permit Number - TC-RES-0723-06615
Permit Status: Complete
Permit Description: ADU and Living Quarters Unit with Porch Addition
Start Date Submittal Complete Date Status  
09/13/2023 RESIDENTIAL NEW DWELLING v.3 10/26/2023 REQUIRES RESUBMIT Review Details
03/05/2024 RESIDENTIAL NEW DWELLING v.4 04/08/2024 REQUIRES RESUBMIT Review Details
05/03/2024 RESIDENTIAL NEW DWELLING v.5 05/15/2024 APPROVED Review Details
09/05/2023 RESIDENTIAL NEW DWELLING v.2 09/05/2023 REQUIRES RESUBMIT Review Details
07/25/2023 RESIDENTIAL NEW DWELLING v.1 08/03/2023 REQUIRES RESUBMIT Review Details
05/16/2024 RESIDENTIAL NEW DWELLING v.1 05/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0723-06615
Permit Status: Complete
Permit Description: ADU and Living Quarters Unit with Porch Addition
Date Description Comments
08/02/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
05/15/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/31/2023 This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
03/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0723-06615
Permite Description: ADU and Living Quarters Unit with Porch Addition
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
06/05/2024 COT - RSBU - Masonry Pregrout N/A Re-inspection required Plans call for 24" minimum above finish grade.
07/22/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable
07/30/2024 COT - RSBU - Roof Nailing N/A Not Applicable work incomplete.
07/30/2024 BULD - Electrical Clearance N/A Not Applicable work completed
07/30/2024 COT - RSPL - Rough Soil N/A Not Applicable Pre fab unit.
07/30/2024 COT - RSBU - Preslab and floodplain N/A Not Applicable no slab
07/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready work incomplete.
07/30/2024 COT - RSEL - Electrical Final N/A Not Ready work incomplete.
07/30/2024 COT - RSPL - Plumbing Final N/A Not Ready work incomplete.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0723-06615
Permit Description: ADU and Living Quarters Unit with Porch Addition
Total Completed Inspections - 11
Date Description Inspector Results Comments
06/07/2024 COT - RSBU - Masonry Pregrout Passed
06/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/15/2024 COT - RSEL - Electrical Underground Passed 7/15/24: conduit is more that 20 inches deep okay to back fill
07/30/2024 COT - RSPL - Yard Water Line Passed
07/30/2024 COT - RSPL - Sewer Passed
10/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/15/2024 COT - RSEL - Electrical Final Passed
10/15/2024 COT - RSPL - Plumbing Final Passed
10/15/2024 RSBU - Building Final Passed
10/15/2024 COT - RSEL - Outdoor Lighting Passed
10/15/2024 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
3325 E FAIRMOUNT UNIT 2.PDF DOCUMENTS VIEW
3325 E FAIRMOUNT UNIT 3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-612K23 3325 FAIRMOUNT SITE UNIT 1-V5_V5_V1.PDF DOCUMENTS VIEW
CONS-612K23 3325 FAIRMOUNT_V5_V2.PDF DOCUMENTS VIEW
DDO_23_85_DECISION.PDF SPECIAL APPLICATIONS VIEW
DDO_23_85_APPLICATION.PDF SPECIAL APPLICATIONS VIEW
DDO_23_85_NOTICE.PDF SPECIAL APPLICATIONS VIEW
DDO_23_85_PLAN SET.PDF SPECIAL APPLICATIONS VIEW