Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4807 E MABEL ST
Address NEW:
4807 E MABEL ST
Apply Date:
06/30/2023
Applicant:
Omhar Acuna
Description:
Gas pack installation

Permit Reviews

Permit Number - TC-RES-0623-06233
Permit Status: Complete
Permit Description: Gas pack installation
Start Date Submittal Complete Date Status  
06/30/2023 RESIDENTIAL SIMPLE REVIEW v.1 06/30/2023 REQUIRES RESUBMIT Review Details
10/05/2023 RESIDENTIAL SIMPLE REVIEW v.2 10/05/2023 REQUIRES RESUBMIT Review Details
10/06/2023 RESIDENTIAL SIMPLE REVIEW v.3 10/09/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0623-06233
Permit Status: Complete
Permit Description: Gas pack installation
Date Description Comments
10/09/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/09/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0623-06233
Permit Description: Gas pack installation
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/23/2023 BULD - Electrical Clearance Passed Current contractor not responsible for electrical upgrades only for HVAC Upgrades. Supports for electrical mast and weatherhead are not properly attached to roof. TEP has installed wiring from pole to weatherhead and meter to meter box and energize system.
10/23/2023 COT - RSEL - Electrical Final Passed
10/23/2023 COT - RSME - Mechanical Final Passed 10-23-23: Current contractor has installed a new heat pump and electrical heat strips, new service outlet on roof for equipment, and new condensate pipe is ran within 6" of ground. Project is complete for HVAC contractor.
Current contractor is not responsible for electrical upgrades only for HVAC Upgrades. Supports for electrical mast and weatherhead are not properly attached to roof. TEP has installed wiring from pole to weatherhead and meter to meter box and energize system.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
4807 E MABEL ST CALCS2_V1.PDF DOCUMENTS VIEW