Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 10/23/2023 |
BULD - Electrical Clearance |
|
Passed |
Current contractor not responsible for electrical upgrades only for HVAC Upgrades. Supports for electrical mast and weatherhead are not properly attached to roof. TEP has installed wiring from pole to weatherhead and meter to meter box and energize system. |