Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSME - Mechanical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2023 | COT - RSME - Mechanical FinalĀ | Passed | 10-23-23: Current contractor has installed a new heat pump and electrical heat strips, new service outlet on roof for equipment, and new condensate pipe is ran within 6" of ground. Project is complete for HVAC contractor. Current contractor is not responsible for electrical upgrades only for HVAC Upgrades. Supports for electrical mast and weatherhead are not properly attached to roof. TEP has installed wiring from pole to weatherhead and meter to meter box and energize system. |