Permit: TC-RES-0623-05944
Permit Details
Status:
Approved
Type:
Residential Building - One or Two Family
Address:
1811 E 10TH ST UNIT 1
Address NEW:
1811 E 10TH ST UNIT 1
Apply Date:
06/15/2023
Applicant:
alex enoch
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0623-05944
Permit Status: Approved
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/21/2023 | RESTAMP - RESIDENTIAL v.1 | 08/21/2023 | APPROVED |
| 06/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/27/2023 | REQUIRES RESUBMIT |
| 07/06/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/21/2023 | REQUIRES RESUBMIT |
| 06/25/2025 | RESTAMP - RESIDENTIAL v.1 | 06/26/2025 | APPROVED |
| 08/15/2023 | RESIDENTIAL NEW DWELLING v.3 | 08/17/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0623-05944
Permit Status: Approved
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 06/03/2025 | Address location has two units. Unit # must be assigned to the Permit Application and Plans before the Certificate of Occupancy (C of O) is issued. Please log into your TDC account and submit a request for an address change. Please submit approved plans without City stamps include the primary address and unit # on ALL plan sheets. Along with a Comment Response, stating that this is a re-stamp to resolve the addressing issue. | |
| 06/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Approved
Permit Number: TC-RES-0623-05944
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/27/23: Laundry drain is going to be tied into bathroom group wet venting and this is not allowed per code (IRC P3108.1). as-built required. proceed at risk. |
| 11/27/2023 | COT - RSBU - Preslab | N/A | Partial Pass | 11/27/23: Laundry drain is going to be tied into bathroom group wet venting and this is not allowed per code (IRC P3108.1). as-built required. proceed at risk. |
| 11/27/2023 | COT - RSPL - Rough Soil | N/A | Partial Pass | 11/27/23: Laundry drain is going to be tied into bathroom group wet venting and this is not allowed per code (IRC P3108.1). as-built required. proceed at risk. |
Completed Inspections
Permit Status: Approved
Permit Number: TC-RES-0623-05944
Permit Description: SFR
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Corrections were made. Rebar in footings per plan. Okay for concrete placement. 11/28/2023 | |
| 11/28/2023 | COT - RSBU - Preslab | Passed | Corrections were made. Rebar in footings per plan. Okay for concrete placement. 11/28/2023 | |
| 01/03/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line, with green tracer wire installed around pipe. Okay to shade pipes and backfill trenches. | |
| 01/03/2024 | COT - RSPL - Yard Water Line | Passed | Water line for both Units 1 & 2 are connected to one meter at this time, with blue tracer wire on each main water supply line. Okay to shade pipes and backfill trenches. | |
| 01/30/2024 | BULD - Electrical Clearance | Passed | Approved new 200A service panel, ECO Clearance to TEP is required for the construction power at unit #1 | |
| 02/07/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/7/24: H2.5 clip's missing west wall first floor, verify 6x6 column at exterior wall and verify proper installation with Simpson HD2A, verify all interior baring walls have anchor bolts spaced 32"o.c, interior column footings missing Simpson CBSQ66, stairway is missing 4x12 at top of stairway connection, beam to beam connection not per plan, window openings not per plan revision is needed, inspection stopped due to rainy conditions more items may be added. Contractor sent a letter to verify all correction have been made. See letter in files. EWS | |
| 02/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 03/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and cover walls | |
| 08/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/28/2024 | RSBU - Building Final | Passed | ||
| 08/28/2024 | COT - RSEL - Electrical Final | Passed | ||
| 08/28/2024 | COT - RSME - Mechanical Final | Passed | ||
| 08/28/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 05/28/2025 | COT - RSEL - Grounding/Bonding | Passed | duplicate | |
| 06/02/2025 | COT - RSPL - Rough Soil | Passed | Duplicate inspection. 6/2/2025 |