Permit: TC-RES-0623-05642
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2227 E HELEN ST
Address NEW:
2227 E HELEN ST
Apply Date:
06/04/2023
Applicant:
Stephen Anson
Description:
SFR with Attached ADU
Permit Reviews
Permit Number - TC-RES-0623-05642
Permit Status: Complete
Permit Description: SFR with Attached ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/05/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/15/2023 | REQUIRES RESUBMIT |
| 06/23/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/10/2023 | REQUIRES RESUBMIT |
| 07/24/2023 | RESIDENTIAL NEW DWELLING v.4 | 07/24/2023 | APPROVED |
| 07/11/2023 | RESIDENTIAL NEW DWELLING v.3 | 07/17/2023 | REQUIRES RESUBMIT |
| 07/24/2023 | RESTAMP - RESIDENTIAL v.1 | 07/25/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0623-05642
Permit Status: Complete
Permit Description: SFR with Attached ADU
| Date | Description | Comments |
|---|---|---|
| 07/13/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05642
Permite Description: SFR with Attached ADU
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/13/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 07/22/2024 | COT - RSME - Mechanical Final | N/A | Partial Pass | |
| 07/22/2024 | RSBU - Building Final | N/A | Not Ready | |
| 07/22/2024 | COT - RSPL - Plumbing Final | N/A | Partial Pass | |
| 07/22/2024 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05642
Permit Description: SFR with Attached ADU
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 9/15/2023 | |
| 09/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footing are properly dug to 12" below grade, with rebar reinforcement in place. Ufer ground is in place and properly connected to rebar reinforcement at bottom of footer. | |
| 09/25/2023 | COT - RSBU - Preslab | Passed | Footing are properly dug to 12" below grade, with rebar reinforcement in place. Ufer ground is in place and properly connected to rebar reinforcement at bottom of footer. Okay to pour concrete slab. | |
| 09/25/2023 | COT - RSEL - Grounding/Bonding | Passed | Footing are properly dug to 12" below grade, with rebar reinforcement in place. Ufer ground is in place and properly connected to rebar reinforcement at bottom of footer. | |
| 10/16/2023 | COT - RSPL - Sewer | Passed | ||
| 10/20/2023 | BULD - Electrical Clearance | Passed | 10/20/23: ECO TEP CLEARANCE 2227 E Helen St Unit #1 and Unit #2 | |
| 10/30/2023 | COT - RSBU - Masonry Pregrout | Passed | ||
| 11/02/2023 | COT - RSPL - Yard Water Line | Passed | 11/2/23: Ok to back-fill | |
| 12/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete on main residence and attached ADU. Okay to install drywall, tape, and texture. | |
| 02/23/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Firewall between main house and ADU is ICCF concrete block from floor to top of roof deck on main house. Okay to drywall firewalls and interior walls and ceiling. | |
| 07/22/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/03/2025 | COT - RSME - Mechanical Final | Passed | ||
| 02/03/2025 | RSBU - Building Final | Passed | Ok to make application for Certificate of Occupancy. | |
| 02/03/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 02/03/2025 | COT - RSEL - Electrical Final | Passed |