Permit: TC-RES-0526-02490
Permit Details
Status:
Revision Fees Due
Type:
Residential Building - One or Two Family
Address:
9707 E PASEO SAN BERNARDO
Address NEW:
9707 E PASEO SAN BERNARDO
Apply Date:
05/12/2026
Applicant:
Ed Craddock
Description:
Rebuilt SFR after explosion and demo TC-DMO-0925-00196
Permit Reviews
Permit Number - TC-RES-0526-02490
Permit Status: Revision fees due
Permit Description: Rebuilt SFR after explosion and demo TC-DMO-0925-00196
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2026 | RESIDENTIAL NEW DWELLING v.2 | 06/26/2026 | APPROVED |
| 10/07/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | N/A | REQUIRES RESUBMIT |
| 05/18/2026 | RESIDENTIAL NEW DWELLING v.1 | 05/29/2026 | REQUIRES RESUBMIT |
| 11/10/2026 | RESIDENTIAL NEW DWELLING REVISION v.2 | 11/17/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0526-02490
Permit Status: Revision fees due
Permit Description: Rebuilt SFR after explosion and demo TC-DMO-0925-00196
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/18/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 05/18/2026 | Prior to Final. There is a demo permit for this structure (TC-DMO-0925-00196). The Demo permit must be completed before this new dwelling permit can be complete. |
| 05/18/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0526-02490
Permit Status: Revision fees due
Permit Description: Rebuilt SFR after explosion and demo TC-DMO-0925-00196
| Date | Description | Comments |
|---|---|---|
| 05/18/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Revision Fees Due
Permit Number: TC-RES-0526-02490
Permite Description: Rebuilt SFR after explosion and demo TC-DMO-0925-00196
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2026 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 8-12-26: provide truss calcs, add anchor bolts to marked locations & tighten all loose anchors, missing AC6 Post cap at front porch column-remove section of osb at column to verify anchor bolts, add nails to sheathing along east side at marked areas, provide ladder to inspect roof. Note: interior framing not inspected at contractors request & provide clarification on which west garage wall okay to be 2x4's. |
Completed Inspections
Permit Status: Revision Fees Due
Permit Number: TC-RES-0526-02490
Permit Description: Rebuilt SFR after explosion and demo TC-DMO-0925-00196
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/30/2026 | COT - RSPL - Gas Pressure Test | Passed | 9/30/26: gas pressure test approved. | |
| 10/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/6/2026 approved. Corrections were made. Revision has been submitted for approval. | |
| 10/06/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP INCR. 10/6/2026 | |
| 11/02/2026 | COT - BULD - SWG Clearance | Passed | 11/02/2026 Approved clearance for Southwest Gas. |