Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/24/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
9/24/26: fire foam penetrations at top plate, weir at laundry doesn't meet code, add fha plate to gas at top plate and provide supports at 4' intervals, add supports to laundry & restroom exhausts above ceiling, kitchen not wired per plans. Submit a revision for added receptacle boxes at bedrooms, tape all tears to ducts and add supports at 4' intervals, add nail plates where closer than 1 1/4" from stud edge, insulate 3/4" hot pex lines, receptacle mounted at pony wall in restroom is overfilled, provide dwv horizontal supports above ceiling and add support to all dwv within 4' aff. Stopped inspection-additional items may be noted. |
| 09/30/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
9/30/26: missing blocking on 4 gang electrical boxes, tape flex tears at marked locations, add fire foam to top plate, missing receptacles at water heater area at garage, submit RFI for added receptacle/lighting awg wires in bedrooms and additional receptacle for intended pantry at kitchen area, add supports to bathroom exhausts, mechanical duct work rough in sizes in is not per plan, duct work shall be a minimum of R6 in conditioned spaces. Submit an RFI for ductwork R-Value and install ducts per plan, replace zip at pantry flex with a nylon strap. |
| 10/06/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
10/6/2026 approved. Corrections were made. Revision has been submitted for approval. |