Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0523-05267
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2409 E 5TH ST
Address NEW:
2409 E 5TH ST
Apply Date:
05/17/2023
Applicant:
Jake Boen
Description:
Remodel SFR
Permit Reviews
Permit Number - TC-RES-0523-05267
Permit Status: Complete
Permit Description: Remodel SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/02/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/14/2023 | APPROVED |
| 05/19/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/20/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0523-05267
Permit Status: Complete
Permit Description: Remodel SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05267
Permite Description: Remodel SFR
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2024 | RSBU - Building Final | N/A | Not Ready | Disconnect for heat strips is not complete and is missing cover |
| 12/06/2023 | RSEL - Electrical Progress | N/A | Re-inspection required | Not ready. Missing ground screws at all metal boxes. Add nail plates to lines that are less than an 1" 1/4. Add fire blocking to the raised ceilings. Fire foam all top penetrations and open cavities. Secure any loose electrical lines. Electrical line that is in the block wall needs to be in conduit or approved material for any moisture. Missing receptacle at kitchen counter top. HVAC work is not completed. Add blocking at home runs and secure lines. 12/6/2023 |
| 12/06/2023 | RSME - Mechanical Progress | N/A | Re-inspection required | Not ready. Missing ground screws at all metal boxes. Add nail plates to lines that are less than an 1" 1/4. Add fire blocking to the raised ceilings. Fire foam all top penetrations and open cavities. Secure any loose electrical lines. Electrical line that is in the block wall needs to be in conduit or approved material for any moisture. Missing receptacle at kitchen counter top. HVAC work is not completed. Add blocking at home runs and secure lines. 12/6/2023 |
| 12/06/2023 | RSPL - Plumbing Progress | N/A | Re-inspection required | Not ready. Missing ground screws at all metal boxes. Add nail plates to lines that are less than an 1" 1/4. Add fire blocking to the raised ceilings. Fire foam all top penetrations and open cavities. Secure any loose electrical lines. Electrical line that is in the block wall needs to be in conduit or approved material for any moisture. Missing receptacle at kitchen counter top. HVAC work is not completed. Add blocking at home runs and secure lines. 12/6/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05267
Permit Description: Remodel SFR
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 10/31/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/11/23: Ground screws have been installed on all metal electrical boxes, bang plates are installed on all electrical and plumbing lines that were too close to the edge of studs, all top plate penetration have been foamed, outlets in kitchen have been installed, all loose electrical wires have been secured, and HVAC rough-in is complete. Okay to insulate and install drywall on ceiling and walls. | |
| 12/18/2023 | BULD - Electrical Clearance | Passed | ||
| 04/23/2024 | RSBU - Building Final | Passed | ||
| 05/03/2024 | RSEL - Electrical Progress | Passed | ||
| 05/03/2024 | RSME - Mechanical Progress | Passed | ||
| 05/03/2024 | RSPL - Plumbing Progress | Passed | ||
| 05/07/2024 | COT - RSEL - Electrical Final | Passed | ||
| 05/07/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/07/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/07/2024 | COT - RSME - Mechanical Final | Passed | ||
| 05/07/2024 | COT - RSPL - Plumbing Final | Passed |