Permit: TC-RES-0523-05107
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
960 W COVENTRY PL
Address NEW:
960 W COVENTRY PL
Apply Date:
05/11/2023
Applicant:
Irvin Gonzalez
Description:
Two Bedroom, Bathroom and Laundry Room Addition
Permit Reviews
Permit Number - TC-RES-0523-05107
Permit Status: Inspections
Permit Description: Two Bedroom, Bathroom and Laundry Room Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2024 | RESIDENTIAL NEW DWELLING v.3 | 10/15/2024 | APPROVED |
| 05/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/15/2023 | REQUIRES RESUBMIT |
| 10/15/2024 | RESTAMP - RESIDENTIAL v.1 | 10/15/2024 | APPROVED |
| 08/30/2024 | RESIDENTIAL NEW DWELLING v.2 | 08/30/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0523-05107
Permit Status: Inspections
Permit Description: Two Bedroom, Bathroom and Laundry Room Addition
| Date | Description | Comments |
|---|---|---|
| 10/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0523-05107
Permit Description: Two Bedroom, Bathroom and Laundry Room Addition
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | COT - RSPL - Rough Soil | Passed | 7-18-25: underground plumbing verified per plans. Okay to backfill-shading required. | |
| 07/28/2025 | COT - RSBU - Preslab | Passed | 7.28.25 | |
| 07/28/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7.28.25 | |
| 08/12/2025 | COT - RSBU - Roof Nailing | Passed | 8-12-25: approved. Okay to dry-in roof. | |
| 08/15/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8-15-25: exterior clip/sheathing approved. | |
| 11/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-4-25: verified shower liner under test together with drywall nailing inspection. Okay to continue with construction. |