Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/08/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
10/8/25: smoke detectors must be 3' from supply air and bathroom openings, missing smoke detectors at north east bedroom, fire block required at all drop ceiling areas, all penetrations through top plate must be sealed, all penetrations through vapor barrier must be sealed, dryer vent must be installed at time of inspection, HVAC registers must be secured on three sides, shower pan will be tested in future inspection, lath inspection approved ok to proceed with stucco, pex line supply coming in from water heater shall not be exposed on east exterior wall of home (must re-route hot water lines) |
| 10/20/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
10-20-25: partial pass pending shower test. Okay to drywall all areas with the exception of shower area. A drywall nailing inspection is required prior to tape & texture. |
| 11/04/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
11-4-25: verified shower liner under test together with drywall nailing inspection. Okay to continue with construction. |