Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/16/2025
Applicant:
Inai Maldonado
Description:
REV1: ADU Height, 4' walkway ADU

Permit Reviews

Permit Number - TC-RES-0425-02031
Permit Status: Inspections complete
Permit Description: REV1: ADU Height, 4' walkway ADU
Start Date Submittal Complete Date Status  
05/05/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/06/2026 APPROVED Review Details
10/15/2025 RESIDENTIAL NEW DWELLING REVISION v.2 10/24/2025 REQUIRES RESUBMIT Review Details
11/12/2025 RESTAMP - RESIDENTIAL v.1 11/12/2025 APPROVED Review Details
06/23/2025 RESIDENTIAL NEW DWELLING v.2 07/23/2025 APPROVED Review Details
04/23/2025 RESIDENTIAL NEW DWELLING v.1 05/29/2025 REQUIRES RESUBMIT Review Details
11/03/2025 RESIDENTIAL NEW DWELLING REVISION v.3 11/12/2025 APPROVED Review Details
09/10/2025 RESIDENTIAL NEW DWELLING REVISION v.1 10/09/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0425-02031
Permit Status: Inspections complete
Permit Description: REV1: ADU Height, 4' walkway ADU
Date Description Comments
07/08/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
04/23/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/19/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0425-02031
Permite Description: REV1: ADU Height, 4' walkway ADU
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/05/2025 COT - RSPL - Rough Soil N/A Partial Pass 12-5-25: underground plumbing verified under test-okay to backfill with shading materials. Greywater will be verified at intermediates.
04/21/2026 COT - RSME - Mechanical Final N/A Re-inspection required 4-21-26: corrections from inspection dated 4/2/26 have been made. Install anti-tip device for stove, paint all exterior plastic on rooftop, submit letter to the city regarding drywall screw inspection.The letter must document that all drywall screws/spacing were installed per plans and meets the 2018 IRC. The letter must be reviewed & approved prior to issuing a C of O or letter of completion. Finally, please schedule all remaining inspections.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0425-02031
Permit Description: REV1: ADU Height, 4' walkway ADU
Total Completed Inspections - 15
Date Description Inspector Results Comments
12/19/2025 COT - RSBU - Preslab Passed 12/19/2025
Approved per plan and setbacks, okay for concrete placement.
12/19/2025 COT - RSEL - Electrical Underground Passed 12/19/2025
Verified 2" schedule 40 conduit in 24" trench running 30ft from ADU service entrance to existing house - okay to backfill with shading materials l
01/21/2026 COT - RSBU - Roof Nailing Passed 01/21/2026
Approved per plan, verified truss calc and nail schedule.
01/21/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 01/21/2026
Approved per plan.
02/02/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2-2-26: corrections made. Okay to drywall progress areas-make sure to schedule a drywall screw inspection prior to tape & texture.
Note: electrical contractor to submit a new floor plan showing panel locations and exclusion of gas.
02/02/2026 BULD - Electrical Clearance Passed 1.2.26
Clearance approved for ECO
Clear for cut over
04/21/2026 COT - RSPL - Rough Soil Passed 4-21-26: previously inspected and approved.
04/21/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 4-21-26: previously inspected and approved.
04/22/2026 COT - RSME - Mechanical Final Passed 4-22-26: approved.
04/22/2026 COT - RSEL - Outdoor Lighting Passed 4-22-26: approved.
04/22/2026 COT - RSEL - Grounding/Bonding Passed 4-22-26: grounding/bonding approved.
04/22/2026 COT - RSPL - Plumbing Final Passed 4-22-26: plumbing final approved.
04/22/2026 COT - RSEL - Electrical Final Passed 4-22-26: electrical final approved.
04/22/2026 COT - RSPL - Yard Water Line Passed 4-22-26: main water line approved.
05/11/2026 RSBU - Building Final Passed 05/11/2026
All documents and corrections made to April inspections.

Documents

File Name Document Type  
EAST_2605041409000_V1.PDF DOCUMENTS VIEW
NARRATIVE REVISION_ TC-RES-0425-02031 925 W CALLE EVELINA_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OWNER-BUILDER-AFFIDAVIT_020625_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN_SET_V2.PDF DOCUMENTS VIEW