Inspection Status: Passed

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
04/02/2026 RSBU - Building Final  Passed 4.2.26
Drywall nailing was never verified, a letter of responsibility/liability will be required from contractor to be submitted.
Appliances on plans are not yet installed.
Insulate waterline at ext hose bib
Lockout caps missing at ac
Exterior receptacle near front door required to be WR (weather resistant)
Provide clarification on remaining inspections and call in all finals for next visit
04/02/2026 RSBU - Building Final  Re-inspection required 4.2.26
Drywall nailing was never verified, a letter of responsibility/liability will be required from contractor to be submitted.
Appliances on plans are not yet installed.
Insulate waterline at ext hose bib
Lockout caps missing at ac
Exterior receptacle near front door required to be WR (weather resistant)
Provide clarification on remaining inspections and call in all finals for next visit
04/22/2026 RSBU - Building Final  Re-inspection required 4-22-26: missing anti-tip device at stove, paint exterior plastic on rooftop, submit letter to the city regarding drywall screw inspection.The letter must document that all drywall screws/spacing were installed per plans and meets the 2018 IRC. The letter must be reviewed & approved prior to issuing a C of O or letter of completion.
Note: see pending condition.
05/11/2026 RSBU - Building Final  Passed 05/11/2026
All documents and corrections made to April inspections.