Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | RSBU - Building Final | Passed | 4.2.26 Drywall nailing was never verified, a letter of responsibility/liability will be required from contractor to be submitted. Appliances on plans are not yet installed. Insulate waterline at ext hose bib Lockout caps missing at ac Exterior receptacle near front door required to be WR (weather resistant) Provide clarification on remaining inspections and call in all finals for next visit |
|
| 04/02/2026 | RSBU - Building Final | Re-inspection required | 4.2.26 Drywall nailing was never verified, a letter of responsibility/liability will be required from contractor to be submitted. Appliances on plans are not yet installed. Insulate waterline at ext hose bib Lockout caps missing at ac Exterior receptacle near front door required to be WR (weather resistant) Provide clarification on remaining inspections and call in all finals for next visit |
|
| 04/22/2026 | RSBU - Building Final | Re-inspection required | 4-22-26: missing anti-tip device at stove, paint exterior plastic on rooftop, submit letter to the city regarding drywall screw inspection.The letter must document that all drywall screws/spacing were installed per plans and meets the 2018 IRC. The letter must be reviewed & approved prior to issuing a C of O or letter of completion. Note: see pending condition. |
|
| 05/11/2026 | RSBU - Building Final | Passed | 05/11/2026 All documents and corrections made to April inspections. |