Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
01/28/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1-28-26: fire foam all penetrations at top plates, add a fha plate at exhaust at top plate, fix tear to flex, seal/fire foam all penetrations at exterior receptacles, strap/secure DWV pipes, missing greywater-see plans for details, missing receptacle in bedroom west wall and another at the north west wall of great room, add Boca plates to DWV, strap secure pex lines at washer/dryer and add another clamp to pex at restroom because it's closer than 1 1 /4" from edge of stud. Site/floor plan shows electrical panels at the southwest corner of home and the panels are currently installed on west side of home. Submit an updated site to the city showing change and contact TEP to confirm current location. Also, plans call for gfci receptacle adjacent to panels and it's missing.
02/02/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2-2-26: corrections made. Okay to drywall progress areas-make sure to schedule a drywall screw inspection prior to tape & texture.
Note: electrical contractor to submit a new floor plan showing panel locations and exclusion of gas.