Permit: TC-RES-0424-02393
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
422 N WILSON AV
Address NEW:
422 N WILSON AV
Apply Date:
04/22/2024
Applicant:
David Mlazovsky
Description:
ADU
Permit Reviews
Permit Number - TC-RES-0424-02393
Permit Status: Complete
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2024 | RESIDENTIAL NEW DWELLING v.1 | 05/24/2024 | REQUIRES RESUBMIT |
| 08/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/22/2025 | REQUIRES RESUBMIT |
| 09/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 09/18/2025 | APPROVED |
| 08/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2025 | REQUIRES RESUBMIT |
| 11/18/2024 | RESIDENTIAL NEW DWELLING v.3 | 12/21/2024 | APPROVED |
| 09/23/2024 | RESIDENTIAL NEW DWELLING v.2 | 10/29/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0424-02393
Permit Status: Complete
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 05/08/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 11/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/30/2025 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
| 05/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0424-02393
Permite Description: ADU
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2025 | COT - RSBU - Preslab and floodplain | N/A | Not Ready | |
| 03/03/2025 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 03/03/2025 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 08/14/2025 | RSBU - Building Final | N/A | Partial Pass | Partial pass. Coat all exterior abs pipes on roof. Install stoop prior to final. Add drip leg to water heater. Pex not rated for PRV. Pending flood plain and other special certificate hold to be removed prior to final. 8/14/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0424-02393
Permit Description: ADU
Total Completed Inspections - 13