Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - TC-RES-0424-02393
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/24/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/08/2024 | Residential Building | REQUIRES RESUBMIT | TC-RES-0424-02393 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. GENERAL REQUIREMENTS: The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans. Provide a response letter on separate file with submitting the updated construction plan set. Clarify if the structure is a sleeping quarters (without kitchen) or an Accessory Dwelling Unit (ADU) which requires many alterations for compliance. Each dwelling unit with kitchen requires a separate Pima County assigned street address after Zoning approval, R319. Show Pima County assigned unit numbers at each dwelling on the site plan. https://www.pima.gov/1010/Addressing-Frequently-Asked-Questions An impact fee payment is required for an ADU at the time of permit payment. GENERAL COMMENTS : 1. All plans submitted for a newly constructed one- or two-family dwelling require compliance with design ordinances for handicap, solar water, photo-voltaic, gray water, and EV charging preparations. Design Ordinances adopted by the City of Tucson. 2. All plans submitted for a newly constructed one- or two-family dwelling after March 1, 2009, require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation. 3. All plans submitted for a newly constructed one- or two-family dwelling after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker space to the last panel space. 4. All plans submitted for a newly constructed one- or two-family dwelling after June 1, 2010, must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one-story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. Use the appropriate detail at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Water-Energy-Conservation Gray Water Illustrations 5. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240-volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space. SITE PLAN: 1. Each dwelling requires an appropriate source of electrical, gas and water supply, R106.1.1. Identify the building shut off device for each utility line. PLANS: 1. Notate a cool (white) roof finish (greater than 60 SRI) as required by the ADU provisions. 2. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include all threshold conditions for a route from the exterior into the living space. 3. Provide manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona, or notate the requirement for deferred submittal, R106.1. SECTIONS - DETAILS: 1. Show one-hour fire-resistive framed construction separating dwellings in compliance with IBC Table 721.1(2). Include a fire rated material at the underside of the roof between dwellings. 2. Attic space requires a ventilation calculation for showing the attic vent opening size using 1 to 150 of attic area in compliance with R806.2. Provide appropriate upper and lower space vents when applying the reduced area calculation. PLUMBING PLANS: 1. Tucson Water Department limits flow rates for the water meter size in compliance with P2903.7. Show an appropriate water meter size. 2. Show each gas pipe segment sized in conformance with Table G2413.4(1). The Distribution totals of 100 LF and 136,000 Btu’s is not consistent with the isometric. Change the main size from 1” to 1-1/4” or reduce the total Btu’s. MECHANICAL PLANS: 1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation with controlled exhaust, R303.4; N1103.6 & M1505.4. Show the minimum airflow rate setting and location of the device requiring this adjustable setting. A one-bedroom dwelling under 1501 SF requires a 30 CFM continuous setting. ELECTRICAL PLANS: 1. Show one 20 AMP branch circuit for the dishwasher/disposal; this circuit may not serve other locations, E3703.8 City of Tucson Amended. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. If you have any questions, please contact: PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
| 05/20/2024 | Site Engineering | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Lianne Evans at lianne.evans@tucsonaz.gov if you have any questions about the FUP. |
||
| 05/24/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Georgia Pennington Planner PROJECT: TC-RES-0424-02393 422 N WILSON AV. – R-1 New Accessory Dwelling Unit (1st Review) TRANSMITTAL DATE: May 22, 2024 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the R-1 zone (UDC 4.7.8). A single-family residence with an accessory dwelling unit (ADU) is permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.5 - .9 & 6.6.3. 1. Provide a residential plot plan that meets the requirements found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example, to include but not limited to: a. The plot plan shall be drawn at an engineering scale. i.e. 1” = 10’, 1” = 20’ etc. b. Provide the zoning of all adjacent properties on the plot plan. 2. Clearly demonstrate that the requirements of UDC Article 6.6.3.B.2 & .3 are met. 6.6.3.B.2 states In addition to parking required for the principal use , one parking space shall be provided for the accessory dwelling unit . The parking requirement may be satisfied with available on-street parking or waived if the site is within ¼ mile walking distance of a transit stop or an enhanced bike route as listed in the Bike Boulevard Master Plan. 6.6.3.B.3 states If the accessory dwelling unit is built as a new structure it must be developed with a high albedo level (>60 SRI) or other cool roof technology per the ICC Green Construction Code. 3. Permit T18CM02027 Enclose Patio and Reframe Roof was never completed and currently is in expired status. A Finals only permit will need to be applied for and the inspections will need to be approved prior to approval of this plan. Contact Joseph Conrad at (520 37-5349 or Joseph.Conrad@tucsonaz.gov for requirements If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 04/23/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |