Permit: TC-RES-0423-04272
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7701 E TULIP TREE ST
Address NEW:
7701 E TULIP TREE ST
Apply Date:
04/10/2023
Applicant:
Angelina Ruiz
Description:
Bathroom, Closet and Laundry Addition
Permit Reviews
Permit Number - TC-RES-0423-04272
Permit Status: Complete
Permit Description: Bathroom, Closet and Laundry Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2023 | RESIDENTIAL NEW DWELLING v.1 | 07/13/2023 | APPROVED |
| 07/25/2023 | RESTAMP - RESIDENTIAL v.2 | 07/25/2023 | APPROVED |
| 04/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/09/2023 | REQUIRES RESUBMIT |
| 05/22/2023 | RESIDENTIAL NEW DWELLING v.2 | 06/15/2023 | APPROVED |
| 06/15/2023 | RESTAMP - RESIDENTIAL v.1 | 06/16/2023 | APPROVED |
| 07/24/2023 | RESTAMP - RESIDENTIAL v.1 | 07/24/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0423-04272
Permit Status: Complete
Permit Description: Bathroom, Closet and Laundry Addition
| Date | Description | Comments |
|---|---|---|
| 06/16/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04272
Permite Description: Bathroom, Closet and Laundry Addition
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 7/21/23: canceled by Flor 7/27/23: epoxy all four rebar into stem, level and compact AB. 8/2/23: soil pipe can not run parallel with the footing. |
| 08/02/2023 | COT - RSBU - Preslab | N/A | Re-inspection required | 7/21/23: canceled by Flor 7/27/23: epoxy all four rebar into stem, level and compact AB. 8/2/23: soil pipe can not run parallel with the footing. |
| 09/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 9/14/23 Residential not ready, needs electrical, fire foam ceiling penetration plumbing air vent needs strap, anchor bolts not opted down, shot nail on toilet room floor. Needs Exterior Clips/Sheathing and roof nailing before residential can be called in. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04272
Permit Description: Bathroom, Closet and Laundry Addition
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2023 | COT - RSPL - Sewer | Passed | 7/18/23: ok to backfill | |
| 07/18/2023 | RSPL - Plumbing Progress | Passed | 7/18/23: Sewer ok to backfill | |
| 08/04/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/04/2023 | COT - RSBU - Preslab | Passed | ||
| 09/12/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 09/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 09/25/2023 | BULD - Electrical Clearance | Passed | TEP INCR cut -over | |
| 09/25/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/14/2023 | COT - RSEL - Electrical Final | Passed | ||
| 11/14/2023 | COT - RSME - Mechanical Final | Passed | ||
| 11/14/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 11/14/2023 | COT - RSPL - Rough Soil | Passed | Duplicate inspection. 11/14/2023 | |
| 11/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Duplicate inspection. 11/14/2023 | |
| 11/14/2023 | RSBU - Building Final | Passed |