Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2023 | COT - RSBU - Preslab | Not Ready | ||
| 07/21/2023 | COT - RSBU - Preslab | Canceled | 7/21/23: canceled by Flor | |
| 07/27/2023 | COT - RSBU - Preslab | Not Ready | 7/21/23: canceled by Flor 7/27/23: epoxy all four rebar into stem, level and compact AB. |
|
| 08/02/2023 | COT - RSBU - Preslab | Re-inspection required | 7/21/23: canceled by Flor 7/27/23: epoxy all four rebar into stem, level and compact AB. 8/2/23: soil pipe can not run parallel with the footing. |
|
| 08/04/2023 | COT - RSBU - Preslab | Passed |