Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
505 S 6TH AV
Address NEW:
505 S 6TH AV
Apply Date:
03/27/2026
Applicant:
Martha Johnson
Description:
WHOLE HOME REPIPE & MAIN WATERLINE SERVICE This estimate is to perform whole home re-pipe, providing hot and cold water lines to all existing current locations of plumbing fixtures Work required to perform task will involve running waterline’s in crawlspace, making penetration’s through the subfloor staying in the first floor walls continuing to the second floor bathrooms All lines will be properly be sized for correct water flow and pressure Lines will be strapped and secured to prevent water hammering all penetrations through any masonry or subfloor to the exterior of home will be sealed Fixture count of home is one kitchen with ice maker box Three full bathrooms Water heater & laundry All materials used will be plastic wirsbo piping with proper wirsbo fittings along with brass and copper fittings transitioning to copper where, stubouts are located next to faucets and toilets where will install new quarter turn angle stops with stainless steel supply lines new shut offs will be installed at main inlet to home and above water heater for emergency future shut off situations BACK STUDIO -This estimate is to perform the task of a re-pipe on back studio suite with one full bathroom and kitchen sink also in addition will install new hot and cold domestic water to all existing plumbing fixtures in the home/office in the back of the property

Permit Reviews

Permit Number - TC-RES-0326-01533
Permit Status: Complete
Permit Description: WHOLE HOME REPIPE & MAIN WATERLINE SERVICE This estimate is to perform whole home re-pipe, providing hot and cold water lines to all existing current locations of plumbing fixtures Work required to perform task will involve running waterline’s in crawlspace, making penetration’s through the subfloor staying in the first floor walls continuing to the second floor bathrooms All lines will be properly be sized for correct water flow and pressure Lines will be strapped and secured to prevent water hammering all penetrations through any masonry or subfloor to the exterior of home will be sealed Fixture count of home is one kitchen with ice maker box Three full bathrooms Water heater & laundry All materials used will be plastic wirsbo piping with proper wirsbo fittings along with brass and copper fittings transitioning to copper where, stubouts are located next to faucets and toilets where will install new quarter turn angle stops with stainless steel supply lines new shut offs will be installed at main inlet to home and above water heater for emergency future shut off situations BACK STUDIO -This estimate is to perform the task of a re-pipe on back studio suite with one full bathroom and kitchen sink also in addition will install new hot and cold domestic water to all existing plumbing fixtures in the home/office in the back of the property
Start Date Submittal Complete Date Status  
04/08/2026 RESIDENTIAL SIMPLE REVIEW v.2 04/08/2026 APPROVED Review Details
03/27/2026 RESIDENTIAL SIMPLE REVIEW v.1 03/27/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0326-01533
Permit Status: Complete
Permit Description: WHOLE HOME REPIPE & MAIN WATERLINE SERVICE This estimate is to perform whole home re-pipe, providing hot and cold water lines to all existing current locations of plumbing fixtures Work required to perform task will involve running waterline’s in crawlspace, making penetration’s through the subfloor staying in the first floor walls continuing to the second floor bathrooms All lines will be properly be sized for correct water flow and pressure Lines will be strapped and secured to prevent water hammering all penetrations through any masonry or subfloor to the exterior of home will be sealed Fixture count of home is one kitchen with ice maker box Three full bathrooms Water heater & laundry All materials used will be plastic wirsbo piping with proper wirsbo fittings along with brass and copper fittings transitioning to copper where, stubouts are located next to faucets and toilets where will install new quarter turn angle stops with stainless steel supply lines new shut offs will be installed at main inlet to home and above water heater for emergency future shut off situations BACK STUDIO -This estimate is to perform the task of a re-pipe on back studio suite with one full bathroom and kitchen sink also in addition will install new hot and cold domestic water to all existing plumbing fixtures in the home/office in the back of the property
Date Description Comments
03/27/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0326-01533
Permit Description: WHOLE HOME REPIPE & MAIN WATERLINE SERVICE This estimate is to perform whole home re-pipe, providing hot and cold water lines to all existing current locations of plumbing fixtures Work required to perform task will involve running waterline’s in crawlspace, making penetration’s through the subfloor staying in the first floor walls continuing to the second floor bathrooms All lines will be properly be sized for correct water flow and pressure Lines will be strapped and secured to prevent water hammering all penetrations through any masonry or subfloor to the exterior of home will be sealed Fixture count of home is one kitchen with ice maker box Three full bathrooms Water heater & laundry All materials used will be plastic wirsbo piping with proper wirsbo fittings along with brass and copper fittings transitioning to copper where, stubouts are located next to faucets and toilets where will install new quarter turn angle stops with stainless steel supply lines new shut offs will be installed at main inlet to home and above water heater for emergency future shut off situations BACK STUDIO -This estimate is to perform the task of a re-pipe on back studio suite with one full bathroom and kitchen sink also in addition will install new hot and cold domestic water to all existing plumbing fixtures in the home/office in the back of the property
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/30/2026 COT - RSPL - Plumbing Final Passed All corrections were made. 4/30/2026
04/30/2026 RSBU - Building Final Passed All corrections were made. 4/30/2026
04/30/2026 RSPL - Plumbing Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-505 S. 6TH AVE DRAWING - 1_V2.PDF DOCUMENTS VIEW