Permit: TC-RES-0325-01617
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2812 N MOUNTAIN AV UNIT 1
Address NEW:
2812 N MOUNTAIN AV UNIT 1
Apply Date:
03/27/2025
Applicant:
Lu Griego
Description:
Bedroom Suite Addition REV1_1. Roof Structure Revision The previously approved plan set utilized pre-fabricated trusses (see approved Roof Plan). The revised submittal replaces the truss system with a conventional wood-framed rafter system. - Rafters are clearly indicated on the Roof / Framing Plan (Sheet A104) - Roof slope, spacing, and structural members have been updated accordingly - All related framing details have been revised to reflect this system 2. Beam and Post Structural Support Due to the change from trusses to rafters, a beam and post support system has been introduced. - Beam support is provided along the wall lines to carry roof loads - Posts transfer loads to the foundation - Structural connections are shown in the updated details Refer to: - Foundation Plan – Detail 2 (Post Column Footing) - Roof Plan / Framing Details – Sheet A104 (Beam + Rafter Connections) 3. Coordination with Structural and Foundation Elements All affected sheets have been coordinated to reflect the revised system, including: - Foundation Plan (updated for post supports) - Roof / Framing Plan (rafters in lieu of trusses) - Structural details and connections 4. Clarification This revision is a design change from truss system to rafter framing, not an omission. All required structural elements and load paths are fully detailed within the submitted plans.
Permit Reviews
Permit Number - TC-RES-0325-01617
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
REV1_1. Roof Structure Revision The previously approved plan set utilized pre-fabricated trusses (see approved Roof Plan). The revised submittal replaces the truss system with a conventional wood-framed rafter system. - Rafters are clearly indicated on the Roof / Framing Plan (Sheet A104) - Roof slope, spacing, and structural members have been updated accordingly - All related framing details have been revised to reflect this system 2. Beam and Post Structural Support Due to the change from trusses to rafters, a beam and post support system has been introduced. - Beam support is provided along the wall lines to carry roof loads - Posts transfer loads to the foundation - Structural connections are shown in the updated details Refer to: - Foundation Plan – Detail 2 (Post Column Footing) - Roof Plan / Framing Details – Sheet A104 (Beam + Rafter Connections) 3. Coordination with Structural and Foundation Elements All affected sheets have been coordinated to reflect the revised system, including: - Foundation Plan (updated for post supports) - Roof / Framing Plan (rafters in lieu of trusses) - Structural details and connections 4. Clarification This revision is a design change from truss system to rafter framing, not an omission. All required structural elements and load paths are fully detailed within the submitted plans.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/07/2025 | RESIDENTIAL NEW DWELLING v.1 | 04/07/2025 | REQUIRES RESUBMIT |
| 03/25/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | 04/08/2026 | REQUIRES RESUBMIT |
| 08/13/2025 | RESIDENTIAL NEW DWELLING v.4 | 08/13/2025 | REQUIRES RESUBMIT |
| 01/30/2026 | RESIDENTIAL NEW DWELLING v.5 | 02/13/2026 | APPROVED |
| 05/19/2025 | RESIDENTIAL NEW DWELLING v.3 | 06/20/2025 | REQUIRES RESUBMIT |
| 04/27/2026 | RESIDENTIAL NEW DWELLING REVISION v.3 | 04/28/2026 | APPROVED |
| 04/09/2025 | RESIDENTIAL NEW DWELLING v.2 | 05/12/2025 | REQUIRES RESUBMIT |
| 04/23/2026 | RESIDENTIAL NEW DWELLING REVISION v.2 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0325-01617
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
REV1_1. Roof Structure Revision The previously approved plan set utilized pre-fabricated trusses (see approved Roof Plan). The revised submittal replaces the truss system with a conventional wood-framed rafter system. - Rafters are clearly indicated on the Roof / Framing Plan (Sheet A104) - Roof slope, spacing, and structural members have been updated accordingly - All related framing details have been revised to reflect this system 2. Beam and Post Structural Support Due to the change from trusses to rafters, a beam and post support system has been introduced. - Beam support is provided along the wall lines to carry roof loads - Posts transfer loads to the foundation - Structural connections are shown in the updated details Refer to: - Foundation Plan – Detail 2 (Post Column Footing) - Roof Plan / Framing Details – Sheet A104 (Beam + Rafter Connections) 3. Coordination with Structural and Foundation Elements All affected sheets have been coordinated to reflect the revised system, including: - Foundation Plan (updated for post supports) - Roof / Framing Plan (rafters in lieu of trusses) - Structural details and connections 4. Clarification This revision is a design change from truss system to rafter framing, not an omission. All required structural elements and load paths are fully detailed within the submitted plans.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/05/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 11/19/2025 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. |
Conditions
Permit Number - TC-RES-0325-01617
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
REV1_1. Roof Structure Revision The previously approved plan set utilized pre-fabricated trusses (see approved Roof Plan). The revised submittal replaces the truss system with a conventional wood-framed rafter system. - Rafters are clearly indicated on the Roof / Framing Plan (Sheet A104) - Roof slope, spacing, and structural members have been updated accordingly - All related framing details have been revised to reflect this system 2. Beam and Post Structural Support Due to the change from trusses to rafters, a beam and post support system has been introduced. - Beam support is provided along the wall lines to carry roof loads - Posts transfer loads to the foundation - Structural connections are shown in the updated details Refer to: - Foundation Plan – Detail 2 (Post Column Footing) - Roof Plan / Framing Details – Sheet A104 (Beam + Rafter Connections) 3. Coordination with Structural and Foundation Elements All affected sheets have been coordinated to reflect the revised system, including: - Foundation Plan (updated for post supports) - Roof / Framing Plan (rafters in lieu of trusses) - Structural details and connections 4. Clarification This revision is a design change from truss system to rafter framing, not an omission. All required structural elements and load paths are fully detailed within the submitted plans.
| Date | Description | Comments |
|---|---|---|
| 04/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |